Skip to content
o. OffertjeCreate a quote ↗
Check the deal before you say yes

Discount profit calculator: how much more must you sell?

A 10% discount can cut your contribution by 50%. Compare the same job or product with and without a discount, then decide whether the extra volume is realistic.

Your numbers

Enter amounts excluding VAT or sales tax. Variable costs rise with each unit: materials, subcontractors, transaction fees and direct labour where applicable. Use 1 unit for a whole project.

The effect on your contribution

Only the rounded selling price and number of units go to your quote. Your costs stay here. Confirm the applicable tax in the editor.

Calculating, drafting and previewing are free. A clean quote PDF costs €0.99 EUR.

What does the calculator actually measure?

Contribution is revenue minus variable costs. It must still cover rent, subscriptions, other fixed costs and profit. It is not take-home pay or net profit. All monetary inputs and the discounted unit price are rounded to two decimals; totals multiply that rounded unit price.

  1. Contribution per unit = selling price − variable cost.
  2. Required units = original total contribution ÷ contribution per discounted unit, rounded up.
  3. Break-even discount = (original price − variable cost) ÷ original price × 100%. This is a theoretical boundary before cent rounding, not a safe commercial discount.

Three alternatives to an open-ended discount

Questions about discounts

Does a 10% discount always halve profit?

No. It halves contribution only when the original contribution is 20% of the selling price. The effect depends on your own costs, and fixed costs still have to be paid.

What if larger orders lower my unit cost?

Run a second scenario with the new variable cost. The volume calculation assumes that the cost entered stays the same for every unit; it does not predict bulk savings or extra staffing.

Can I use this for an hourly service?

Yes. Use your hourly selling price, variable cost per billable hour and expected billable hours. Capacity matters: needing twice as many hours may be impossible even if the arithmetic works.

Continue with your price